Highways & Roadways

Transportation Plan for Lower Route 202, 2015

route204WestCOG in conjunction with the Connecticut Department of Transportation and the Town of Brookfield identified the need for a comprehensive study of the Lower Route 202 corridor, which encompasses a 1.6-mile stretch from White Turkey Road to Route 133 in Brookfield. WestCOG contracted with Milone & MacBroom, Inc. to undertake this study and ultimately develop a Transportation Plan for Lower Route 202.

Final Report

Long Ridge – High Ridge Corridors Study, 2015

Long Ridge High Ridge CoverThis final report of the Long Ridge Road – High Ridge Road Corridors Study summarizes two years of coordinated planning efforts by many Stamford residents, business owners, elected officials, municipal officials, advocacy groups, and state agency representatives. The study was led by the City of Stamford and guided by a Technical Advisory Group (TAG).

Final Report

Route 1 Greenwich-Stamford Study, 2012

Route 1 StudyThe purpose of this study is to develop a plan to improve traffic operations and safety, improve pedestrian friendliness, manage access, minimize congestion, accommodate transit, and enhance the corridor’s economic potential and community character.

Route 7 Corridor Assessment and Implementation Plan, 2012

Route 7 Existing Conditions Report DRAFT V2-5-29-12This study will develop a phased implementation improvement plan for the Route 7 corridor from the vicinity of Route 7 Expressway and Route 123 (Norwalk) to Route 7 and Wolfpit Road (Wilton). This project is being undertaken because the Connecticut Department of Transportation (CTDOT) determined in 2009 that funding for two longstanding priority projects is not available. This study will address multi-modal operational and safety needs in the corridor that are not currently being pursued in any active planning, design or funded programs.

 

Bethel Routes 6, 53, 58, and 302 Curb Cut Management Plan, 2012

Curb_Cut_Management_Plan_Bethel_20120222A townwide access management plan as requested by Bethel and adopted into the Bethel Zoning Regulations in 2012.

Final Report

 

Route 7 Transportation and Land Use Study, 2011

Route 7 coverjpg_Page1A guide to future transportation investments on the existing roadway, accompanied by land use recommendations for adjacent development. This transportation study was conducted by HVCEO in cooperation with SWRPA.

Route 7 Driveway Management Plans for Danbury, Redding, and Ridgefield, 2011

route7_danbury_accessmanagementplan_july2011Updates the 1996 Route 7 Access Management Plans for these communities. These 2011 updates were again prepared for use as site plan standards to be referenced in municipal zoning regulations.

 

Transportation Plan for Newtown Road (Route 806) in Danbury, 2011

transport_danbury_newtownroadplanThis roadway corridor plan will serve as the base for transportation improvements, sidewalk extensions, and some site plan approvals.

Final Report

 

Curb-Cut and Access Management Plan Route 6, Portions of Route 25, and Church Hill Road Newtown, CT, 2010

newtown Route 6 25 access mgmtAn updated and expanded driveway management plan for use by the Newtown Planning and Zoning Commission.

Final Report

 

I-84 Toll Plaza Impact Study, 2009

i84_toll_plaza_impact_studyA review of impacts of potential I-84 tolls on traffic and quality of life in Greater Danbury. Prepared as input to the debate on reestablishing tolls on expressways in Connecticut.

Final Report

 

New Milford Routes 7 and 202 Access Management Plan, 2009

transport_newmilford_curbcutplan2008This important traffic safety planning tool is an update of the HVCEO driveway management plan adopted in 1997 by the New Milford Zoning Commission. This update was approved as a standard within the New Milford Zoning Regulations.

Final Report

Danbury Hospital “H” Emergency Sign Plan, 2008

Danbury_Hospital_H_Sign_Plan_2008An update of the 1991 regional sign plan to identify best ambulance routes, sign attrition, locations for new signs, costs and responsibilities. In 2007 Danbury installed the H signs recommended by this plan.

Final Report

Danbury Hospital and WCSU Traffic Plan, 2007

Traffic Improvement Plan WCSU and Danbury HospitalA study to enhance traffic flow near regional institutions in the City of Danbury.

Final Report

 

 

Queen Street Area Traffic Improvement Plan Newtown, CT, 2006

transport_newtown_QueenAreaReportThis traffic and pedestrian plan for the center of Newtown serves as input to local traffic decisions.

Final Report

 

I-84 Exit 9 Hawleyville (Newtown) Study, 1997

transport_newtown_Exit9HawleyvilleTransportationStudyThis innovative plan provides coordination of local zoning and transportation for the Exit 9 interchange area. The results were incorporated into the Town of Newtown Zoning Regulations.

Final Report